Pre-build survey
Director walks the site and signs off the design before erection begins.
Safety
Every scaffold we erect is surveyed by a director before a tube goes up. CISRS-ticketed erectors, full H&S documentation, and a zero-incident record since we started trading.
Our approach
Every build starts with a pre-erection survey. We check the ground conditions, loading requirements, and any public access risks before a single standard is placed.
We carry full employers' liability and public liability insurance. All scaffolds are handed over with a formal completion certificate and a scaffold tag system for weekly inspections throughout the hire period.
Our process
Director walks the site and signs off the design before erection begins.
Every operative holds a valid CISRS card. No exceptions, no subcontractors without checks.
Structural calculations provided for any non-standard loading or complex configuration.
Formal documentation signed off at handover. You know it's safe before anyone sets foot on it.
Weekly inspection tags updated on-site. Any defect found is rectified within 24 hours.
Fan decks, debris netting and pedestrian barriers installed wherever required.
Accreditations
Every operative holds a valid CISRS card. The industry-recognised benchmark for scaffolding competency.
Independently assessed for health and safety compliance. Required by most major contractors and councils.
View certificateFull NASC membership. Audited annually against the SG4 and TG20 guidance documents.
View certificateVerified against pre-qualification standards for public and private sector procurement.
View certificate
Safety questions?
We don't have a safety department — the people running the jobs are the same people responsible for safety. Ring us and speak to someone who knows.